 |
 |
|
 |
 |
|
|
Increasing Hydrocarbon Production
|
Increasing Hydrocarbon Production
|
|
For a mature carbonate field with already 25 years of production history, we designed a development scheme that more than tripled production.
The comparison of the actual oil production and our forecast (forecasted 6 years ago), shows an excellent match between actual and forecast.
|
|
|
 |
|
|
 |
HOT Engineering GmbH Tel: +43 3842 43 0 53-0 Fax: +43 3842 43 0 53-1 Mail: |
|