Production Optimisation
Sucker-Rod Pumping Optimization
A project to improve sucker-rod pumping operations. Optimum pumping system designs under maximized liquid production were determined and verified.
Gas Lift Optimization
Current gas lift operations were assessed. The optimum gas lift system was designed for the planned re-development of the field, resulting in higher production rates and reduced lift-gas requirements.
Assessment of Shut-in Wells
A project to review shut-in wells for their potential use as producers, injectors or disposal wells. Detailed recommendations for future use of these shut-in wells were given.
|
|
|
 |
|
|
 |
HOT Engineering GmbH Tel: +43 3842 43 0 53-0 Fax: +43 3842 43 0 53-1 Mail: |
|